University of Wisconsion - Eau Claire

UWEC

arrow_back

Proposal

Lab setup for Riverside building move


Beginning date:
2026-12-01
Ending Date:
2027-12-31

Project Proposal Description

1.

Briefly describe the project and the community need to be addressed.

Answer In this project, you will assist with the move from Phillips Hall to Riverside Science Center for the Materials Science & Biomedical Engineering department.

2.

What is the mission of the agency or organization?

Answer The MSBME department at UWEC exists to train the next generation of Biomedical Engineers, Materials Scientists, and Materials Engineers.

3.

What skills are required for this project?

Answer A willingness to learn, strong organizational skills, and an abiltity to work safely in a laboratory environment.

4.

What are the learning objectives for this project

Answer In this project, students will: -Demonstrate an understanding of the safety and logistical requirements of a science teaching lab -Integrate big picture needs of the department with the granular needs of a particular lab or space -Demonstrate an ability to meet the needs of various stakeholders (e.g. faculty, staff, students, and the general public).

5.

What are the availability requirements for the student?

Answer Availability requirements vary based on the time of year of the project.

6.

Additional information (not required).

Answer N/A